- 1. Corrigendum (Date : 19-05-2026)
- 2. Pre-Bid Reply (Date : 19-05-2026)
- 3. Revised Make list – civil (Date : 19-05-2026)
- 4. Revised Make list – HVAC_Fire (Date : 19-05-2026)
- 5. Revised Scope of work_R1 (Date : 19-05-2026)
- 6. Site Visit Certificate (Date : 19-05-2026)
- 00 NIT Tender Details (Date : 01-04-2026)
- 1. Volume – I (Date : 01-04-2026)
- 2. Volume – II (Date : 01-04-2026)
- 3. 202210-TS-Incite Building-Part 1(Civil) R1 13.01.26 (Date : 01-04-2026)
- 4. 202210-TS-Electrical Part 2 TS2 (Date : 01-04-2026)
- 5. 202210-TS-HVAC BMS (Date : 01-04-2026)
- 6. 202210 INCITE DBR Scope of work (Date : 01-04-2026)
- 7.1 202210-INC-S4-LOM-001 Civil 16.02.26 (Date : 01-04-2026)
- 7.2 202210-INC-S4-LOM-001 ELECTRICAL_R1 (Date : 01-04-2026)
- 7.3 202210-INC-S4-LOM-001 HVAC BMS (Date : 01-04-2026)
- 8. 202210-gbu-incite finishing schedule R2 (Date : 01-04-2026)
- 9. 202210-BOQ- Incite Building Civil R5 dt 16.02.26a (Date : 01-04-2026)
- NIT Tender Details (Dated: 04-08-2025)
- Facade-SBD (Dated: 04-08-2025)
- Civil Technical Specification Facade (Dated: 04-08-2025)
- Building-Specification Dated: 04-08-2025)
- Electrical Technical Specifications Facade Dated: 04-08-2025)
- Make Of Material List Dated: 04-08-2025)
- GBU Special condition Dated: 04-08-2025)
- Schedule-B Dated: 04-08-2025)
- FACADE TENDER DWGS Dated: 04-08-2025)
- RFP for supplying, installing & commissioning of Servers, Storage, Network Switches, Smart Rack, and UPS components.(Dated: 15 Oct 2024)” and “Last date for submission extended: 14/11/2024)
- RFP for supplying, installing & commissioning of Servers, Storage, Network Switches, Smart Rack, and UPS components.(Dated: 15-10-2024)